The project

A volunteer board faces inspection deadlines, competing contractor bids and a reserve study nobody has time to read. We built three advisory products that turn each into a packet the board can vote on.

What we built

  • A milestone-inspection and structural integrity reserve study (SIRS) packet: a gap checklist, an inspection scope the board can send out for bids, and a board memo
  • Bid leveling: an apples-to-apples matrix of competing proposals and a plain-English recommendation
  • A reserve-study summary that turns the report into a board action plan

Built with

  • Claude skills
  • Python
  • Spreadsheet and document generation

Advisory only. Collaborative Concept is not a law firm, an engineer or a licensed contractor, and it does not bid on the projects it levels. Nothing in a packet is legal advice or an engineering opinion: whether a statute applies to a particular building, and a board’s legal deadlines, are for the board’s attorney and its licensed inspecting professional to determine. Inspections, structural integrity reserve studies and sealed reports come from the licensed or certified professionals a board engages.