Double-Lot Site
Two adjacent parcels planned together as one development.
Active — Raising Capital

Two adjacent parcels planned together as one development.
Lot A leads; Lot B follows the same milestone sequence.
Designed to the coastal and floodplain requirements that govern the site.
Budget, schedule and sensitivity work is currently underway.
Project attributes are provided on request and are subject to verification.
A non-conforming double-lot assembled for residential development.
Two contiguous lots on a waterfront street in Madeira Beach, on Florida's Gulf coast. Planned as one project rather than two, the site supports elevated coastal residences designed inside the envelope the site actually allows.
Figures are withheld while diligence is open. The current, verified set is released with the project package, alongside the documents behind it.
See it in Selected Work

| Status | Active — Raising Capital |
|---|---|
| Asset type | Provided on request |
| Site configuration | Provided on request |
| Entitlement posture | Provided on request |
| Program | Under review |
| Site area | Provided on request |
| Design status | Under review |
| Resilience approach | Provided on request |
| Delivery approach | Provided on request |
| Capital structure | Provided on request |
| Schedule | Provided on request |
| Diligence package | Available on request |
All attributes are released with the project package and are subject to verification.
Disciplined sequencing with clear milestones and decision points.
Confirm what the site supports.
Consultants of record work inside the envelope.
Scopes are defined, then priced.
Built by a licensed general contractor.
Reported against the plan of record.
Staged behind Lot A.
Shared conditions resolved once.
Scopes carried over and re-priced.
Same contractor, same standards.
Lessons from Lot A applied.
Sequence is indicative of method. Milestone timing depends on third-party review and is provided with the project package.
Investor funds are administered through a structured draw schedule with third-party oversight. Terms are provided with the project package.
Clear roles. Independently licensed scopes. One accountable sponsor.
Developer / Project Sponsor
Construction Manager

We manage these actively and carry contingency in the plan rather than hope for it.
| Permitting & entitlements | Agency review timing sits outside our control. | Approval-dependent work is sequenced early with experienced local consultants. |
|---|---|---|
| Construction costs | Material pricing and trade availability move. | Scopes are defined before they are priced, with contingency carried. |
| Weather & force majeure | Coastal work carries seasonal and storm exposure. | Schedule float, insurance and proactive jobsite planning. |
| Market conditions | Demand and absorption conditions change. | Tested against a range of conditions, not one favorable case. |
| Financing | Availability and cost of capital can change. | Conservative assumptions and flexible financing options. |
This page is informational only. It is not an offer to sell, or a solicitation of an offer to buy, any security, interest, or property, and it is not investment, legal, tax, or accounting advice. Any offering, if made, would be made only through definitive documents to eligible parties.
All project figures, attributes, schedules, structures, and terms are provided on request and are subject to independent verification and to change. Nothing on this page should be relied upon without review of the complete project materials and independent professional advice.
Collaborative Concept acts as developer and project sponsor. Architectural, engineering, survey, construction, brokerage, legal, appraisal, and inspection services are performed by separately engaged, independently licensed professionals.
Plans, diligence materials, budget and schedule detail and the full risk discussion are released on request.